When the Utility Drops, Your Building Doesn’t.

Standby generators, automatic transfer switches and UPS systems, installed, connected and tested for facilities where an outage costs real money or puts people at risk.

Generators, ATS & UPS

Backup Power Only Counts If It Transfers.

A generator that has never been load tested, or a transfer switch wired to the wrong loads, is a false sense of security. Emergency, legally required and optional standby systems each carry their own code requirements, and healthcare and mission-critical facilities add transfer time and redundancy on top.

We install the complete backup power path: generator set and connections, fuel and exhaust coordination with the mechanical trades, transfer switches, UPS and batteries, and the distribution they feed. Then we test it with the owner watching, so everyone knows it works before the day it has to.

Scope

What We Install

  • 01

    Standby generators

    Setting, connecting and commissioning diesel and natural gas generator sets.

  • 02

    Automatic transfer switches

    ATS installation, including load separation for emergency, legally required and optional standby branches.

  • 03

    Paralleling gear

    Paralleling switchgear for multi-generator systems and redundancy.

  • 04

    UPS systems

    UPS installation, battery systems and bypass arrangements for critical loads.

  • 05

    Generator connections

    Docking stations and quick-connect cabinets for portable generators.

  • 06

    Load testing

    Startup, load bank testing and witnessed transfer tests at closeout.

Why Anvil Edge

Why Owners Trust Us With It

  1. 01

    Healthcare experience

    Our leadership has run essential electrical systems on VA hospitals and medical facilities.

  2. 02

    Mission-critical mindset

    Redundancy and transfer paths planned so single points of failure are designed out.

  3. 03

    Code-driven separation

    NEC 700, 701 and 702 systems kept separate as the code requires.

  4. 04

    Tested, not assumed

    Every system is load tested and transfer tested before turnover.

Process

From Sizing to Witnessed Test.

  1. 1

    Loads & Sizing

    Critical loads identified and coordinated with the engineer of record.

  2. 2

    Equipment Release

    Generator, ATS and UPS submittals and lead times locked in.

  3. 3

    Install & Connect

    Pads, conduit, feeders and control wiring installed.

  4. 4

    Startup

    Manufacturer startup and system checks.

  5. 5

    Load & Transfer Test

    Load bank and transfer testing with the owner present.

FAQ

Common questions.

What is the difference between emergency and standby power?

Emergency systems (NEC 700) power life safety loads like egress lighting and must transfer within 10 seconds. Legally required standby (NEC 701) and optional standby (NEC 702) serve other loads with less strict requirements. Each has to be kept separate as the code requires.

Do you install UPS systems as well as generators?

Yes. For data rooms and critical equipment we install the UPS and batteries to carry the load through the transfer, and the generator to carry it after.

Can you add a generator to an existing building?

Yes. We assess the existing service and distribution, separate the loads to be backed up, and plan the tie-in with a short scheduled shutdown.

Start a project

Planning Backup Power?

Tell us what has to stay on and for how long. We will scope the generator, transfer and UPS side.